INSTALLTION
- Determine the starting position according to the design and wall dimensions and use the spirit level to determine the position of the first 8mm closing line and nail it fixed.
- After the structural adhesive is applied to the back of the bamboo charcoal fiber solid board, the first plate is snapped into the profile for installation.
- Insert an 8mm I-wire from the side of the plate and nail it to fix and continue to install the plate in the same way until the corner.
- The male angle should not use 8mm male angle wire and install the plate on its side.
- Finally, after the edge of the plate is marked with nail-free glue and the edge is installed, the edge is fixed with beautiful sewing paper.